
Every production-readiness checklist in circulation tests accuracy, latency, hallucination rate and security posture. Those matter, and they are almost never the reason a pilot dies. The pilot dies because the organisation could not absorb it — so the gates below test that instead.
Gate 1 · A named workflow with a P&L owner
Pass condition: one person can be named who reports a number that changes if this works. Remedy on failure: stop and find the workflow. Nothing downstream is worth doing until this exists, because without it success is unattributable and therefore unfundable.
Gate 2 · A baseline measured before the pilot
Pass condition: you can state today's cost, time or error rate for the workflow. Remedy: spend a week measuring before you build anything. Teams that skip this can never prove the improvement, which is how a working deployment loses its budget.
Gate 3 · The eventual operators were present during the pilot
Pass condition: the people who will use it daily were in the room, not represented by a manager. Remedy: rerun the pilot with them. A tool designed around a proxy for the user gets worked around by the actual user.
Gate 4 · A human gate on the failure modes
Pass condition: you can name what happens when the output is wrong, who catches it, and what it costs. Remedy: instrument the failure path before scaling the success path.
Gate 5 · Governance sign-off before scale
Pass condition: legal and risk have reviewed at the tier the workflow actually sits in, not at the tier of the pilot's twelve users. Remedy: bring them in now — the review takes weeks when it precedes scale and quarters when it follows it.
Gate 6 · A handover date with a named owner
Pass condition: a date exists after which your team runs this without the vendor. Remedy: contract it. If handover is not an event with a name and a date, it does not happen.
Six gates, and only one of them is about the software.
Where partner selection sits
Between gates 1 and 2. Naming the workflow tells you which partner is even relevant; measuring the baseline is something the right partner will insist on before building. If you are choosing a supplier before gate 1, you are shopping without a specification.
Reading helps. Seeing the capability tested is better.
When you're ready to move from ideas to evidence, bring us the problem and we'll build the right session around it. The first one is free.